úÎ 7     NoneAdd a 1 to measure evaluation to weak head normal form. Add a ' to measure evaluation to normal form. Add a 7 to measure evalution time with the provided strategy. Add a 1 to measure IO time (no additional evaluation is G performed, although the IO action itself may perform some evaluation) Add a 3 to measure time of IO and evaluation to weak head  normal form. Add a 6 to measure time of IO and evaluation to normal form. Add a / to measure time of IO and evaluation with the  provided strategy.        chronograph-0.1.0.0Data.Chronograph ChronographvalmeasurechronochronoNFchronoBy chronoJustIOchronoIO chronoNFIO chronoIOBy