Build #3 for SCalendar-1.1.0
Package | SCalendar-1.1.0 |
---|
Install | InstallOk |
---|---|
Docs | Ok |
Tests | NotTried |
Time submitted | 2017-11-08 01:55:56.836049578 UTC |
---|---|
Compiler | ghc-8.0.2 |
OS | linux |
Arch | x86_64 |
Dependencies | base-4.9.1.0, containers-0.5.7.1, text-1.2.2.2, time-1.6.0.1 |
Flags | none |
Code Coverage
No Code Coverage was submitted for this report.
Build log
[view raw]
Resolving dependencies... Configuring text-1.2.2.2... Building text-1.2.2.2... Installed text-1.2.2.2 Configuring SCalendar-1.1.0... Building SCalendar-1.1.0... Installed SCalendar-1.1.0
Test log
No test log was submitted for this report.